Better Decisions. Better Products. Better results.
Product Design Decision
What happens when one design choice affects every product variant?
Decisions about architecture, configuration and change shape not only how a product works, but how easily it can be built, serviced and improved.
How should we design, configure and change the product?
-
Prepare
Understand customer and product requirements
Evaluate concepts and design alternatives
Assess architecture, cost, quality and risk
Define platforms, modules and configuration rules
Assess change impact across the product lifecycle
-
Make
Which product concept and architecture should we select
Which requirements and features should we prioritize?
What should be common, modular or configurable?
Is the design ready to be approved and released?
Should the proposed engineering change be approved?
-
Execute
Translate decisions into controlled product definitions
Develop and verify the selected solution
Release product structures and configurations
Implement engineering changes across affected functions
Confirm that changes have been implemented as approved
-
Measure
Did the decision deliver the expected product cost or margin improvement?
Was product and configuration complexity reduced as intended
Did the engineering change achieve its approved financial benefit?
Have quality, warranty or nonconformance costs improved?
Did increased reuse reduce engineering effort and development cost?
-
Related standard and lifecycle processes
ISO/IEC/IEEE 15288: Stakeholder Needs and Requirements Definition; System Requirements Definition; Architecture Definition; Design Definition; Decision Management; Configuration Management; Verification; Validation
ISO 9001: Design and Development
ISO 10007: Configuration Management Planning; Configuration Identification; Change Control; Configuration Status Accounting; Configuration Audit
Example
Engineering Change Management
Prepare: What products, configurations, parts, suppliers, plants, inventory and installed products are affected?
Make: Should the change be approved, and when should it take effect?
Execute: Release and implement the change across engineering, sourcing, manufacturing and service.
Measure: Did the change deliver the expected cost, quality, compliance or performance improvement?